Target costing
Start from the price the market will pay and work back to cost.
A mixer-grinder costs ₹2,650 to make. Rivals sell for ₹3,000, and the firm wants 20% profit on price. Should it raise its price or cut its cost?
Target cost = selling price − desired profit. The price is fixed by the market, so the cost is the thing to change, and most of it is set in design.
Chennai Mixers has designed a mixer-grinder that costs ₹2,650 to make. Rivals sell similar ones for ₹3,000. Adding its usual 20% to cost gives ₹3,180, which no buyer will pay. Is the answer to lower the margin, or to lower the cost?
In plain wordsTarget costing starts from the price the market will pay, takes away the profit the firm wants, and treats what is left as the most the product may cost. The task is then to design the product to that cost.
Exam definitionTarget cost is a cost estimate derived by subtracting a desired profit margin from a competitive market price. Target costing is a management technique in which prices are set by market conditions and costs are planned and managed out of a product early, in design and development.
The mixer-grinder. Market price ₹3,000. Desired profit 20% of price = ₹600. Target cost = ₹3,000 − ₹600 = ₹2,400. The first design costs ₹2,650, so there is a gap of ₹250 to be designed out.
| Action | Saving per unit |
|---|---|
| Redesign the casing and remove a part | ₹120 |
| Renegotiate the motor price with the supplier | ₹80 |
| Cut a step from assembly | ₹50 |
| Total | ₹250 |
If the design could not be changed and the firm sold at ₹3,000, it would earn ₹350, which is only 11.7% of the price against the 20% wanted.
Why use it. When products are alike, competition is strong and customers switch easily, the firm cannot set the price, so it must control the cost. Most of a product’s cost is fixed at the design stage, so the saving must be sought there, not after production has begun.
| Step | What happens |
|---|---|
| 1. Market research | Learn what customers want and what they will pay |
| 2. Maximum cost | Set the profit margin and from it the highest allowable cost |
| 3. Design the product | Engineers and designers create it to that cost |
| 4. Analysis and adjustment | Compare design cost with the target; redesign or cut costs if over |
| 5. Design improvement and trials | Test features; continue until cost and customer needs are both met |
| 6. Management approval | Present the design, tests and cost to management |
| 7. Record keeping | Keep accounts to check costs stay within the target |
| 8. Implementation | Make the product, and keep checking cost and quality |
Objectives. To lower the cost of new products so that the required profit is ensured; to meet the quality, delivery time and price the market needs; and to make everyone in the firm responsible for the target profit.
Benefits. Better profit through lower cost, innovation shaped by what customers want, customer satisfaction, and a leaner production process.
Don’t confuse target costing with cost-plus pricing. Cost-plus starts with cost and adds profit to reach a price. Target costing starts with the price and takes profit away to reach a cost. The first lets inefficiency pass into the price; the second makes the cost bear the pressure of the market.
Where it breaks. A target set too hard may lead designers to cut quality or safety, or to push the cost onto suppliers who cannot bear it. A product with no real market price, such as a new invention, has nothing to start from. The work in design and testing adds cost of its own.
For exams. Know the formula, the contrast with cost-plus, the objectives, the steps and the benefits.
Price first, profit second, cost is what is left.
Go deeper for practitioners
Value engineering. The main tool for closing the gap is to study each part of the product for what it does for the customer and what it costs, then to remove features the customer does not value or to find a cheaper way to deliver the ones they do. Cost is taken out in design, not squeezed in the factory.
A decision. A target cost calls for dropping a feature that your sales team says some customers like. How would you decide whether to keep it?
1. The market price is ₹3,000 and the desired profit is 20% of price. The target cost is…
Not quite. The answer is “₹2,400”. 20% of ₹3,000 is ₹600, and ₹3,000 − ₹600 = ₹2,400.
2. The first design costs ₹2,650 against a target of ₹2,400. The cost gap to close is…
Not quite. The answer is “₹250”. ₹2,650 − ₹2,400 = ₹250 per unit.
3. How does target costing differ from cost-plus pricing?
Not quite. The answer is “It starts from the market price and works back to a cost”. Cost-plus starts from cost; target costing starts from price.
“Think of a product you buy often. Which feature could its maker remove without you noticing, and what would that save?”
Still unsure, or see it differently? Ask the community about thisYou’ll sign in first if you haven’t. Your note above stays private.
- Target cost = Selling price − Desired profit.
- Price is set by the market, so cost is managed from the design stage.
- Steps: research, maximum cost, design, adjust, improve, approve, record, implement.
- Benefits: profit, innovation, customer satisfaction, efficient production.
Price first, profit second, cost is what is left.